
Infrastructure engineering·Bangladesh·Since 2010
We build theinfrastructurea country runs on.
An integrated EPC contractor delivering power, transport, water and marine assets across Bangladesh — engineered, procured and constructed in-house.
184
Projects delivered
2,340 MW
Generation installed
612 km
Road & rail delivered
11.4M
Safe man-hours
01—Capabilities
A single contractual line from drawing to handover.
Devezer Real Estate has executed infrastructure works in Bangladesh since 2010 as main contractor, EPC contractor and joint-venture partner.
We hold design, procurement and construction under one management system, with in-house fabrication and a directly owned plant fleet. That structure is why our programmes hold: interface risk between designer, supplier and builder is carried by us, not by the client.
A
Design & Engineering
In-house structural, electrical and mechanical design teams working to BNBC, AISC and IEC standards, with full 3D coordination before mobilisation.
B
Procurement & Construction
Vendor pre-qualification, expediting and inspection, own fabrication yards and a 240-unit plant fleet under direct control.
C
Operations & Maintenance
Long-term O&M contracts on power and water assets, with condition monitoring, spares management and trained local operating crews.
02—Sectors
Six sectors. One delivery organisation.
01
Power
Generation, substations and transmission up to 400 kV.
46 projects
02
Transportation
Highways, bridges, flyovers and rail formation works.
38 projects
03
Oil, Gas & Petrochemicals
Pipelines, terminals, tankage and process plant.
21 projects
04
Water
Treatment plants, intakes, embankments and drainage.
29 projects
05
Port Facilities
Jetties, quay walls, dredging and marine structures.
17 projects
06
Real Estate
Industrial buildings, structural steel and fit-out.
33 projects
03—Selected projects
Delivered under public tender and international JV.
04—Record
Projects delivered
Generation installed
Road & rail delivered
Safe man-hours

05—HSE & Sustainability
Safety is a programme input, not a poster.
0.21 LTIFR
Rolling 36-month lost-time injury frequency rate
ISO 45001-certified management system, 62,000 training hours logged in the last three years, and an environmental framework covering commitment, operations, communication, evaluation and continuous improvement.
Sustainability record →06—Clients & accreditations
Have a project?
Tender documents, RFQs and pre-qualification requests are handled by our contracts desk in Dhaka.


